ST7Investigate and employ innovative technologies for pavement stabilisation, reinvigoration, seal design for construction and repair of roading

Progress

On time
  • Yet to commence
  • Current
  • Ongoing
  • Completed

Official name

Investigate and employ innovative technologies for pavement stabilisation, reinvigoration, seal design for construction and repair of roading.
(According to the action plan)

Annual report

Report: 7/1/2021 6/30/2022
Sustainability Action Plan Annual Report 2021-2022

Current reporting comment

Crumb rubber material considered for sealed roads along Mt Shadforth Rd, She-oak Drive, and Ti-tree Lane however not undertaken due to temperature conditions outside of summer months. Fibredec being considered as an alternative engineering solution.
Report: 7/1/2022 6/30/2023
Sustainability Action Plan Annual Report 2022-2023_1

Current reporting comment

Crumb rubber material considered for sealed roads along Mt Shadforth Rd, She-oak Drive, and Ti-tree Lane however not undertaken due to temperature conditions outside of summer months. Fibredec being considered as an alternative engineering solution.
Report: 7/1/2023 6/30/2024
Sustainability Action Plan Report 2023-2024_FINAL

Current reporting comment

Crumb rubber material considered for sealed roads along Mt Shadforth Rd, She-oak Drive, and Ti-tree Lane however not undertaken due to temperature conditions outside of summer months. Fibredec being considered as an alternative engineering solution.

Read more

Summary and contacts

Responsible organisations

  • Priority

    Medium

Class

Resourcing Required

  • KPI/Measure of Success

    Investigations undertaken with new innovations and technologies budgeted for road design
Information updated 08/10/2023