Skip to main content

SW3Investigate fire-resistant options for installation of durable water tanks on Shire buildings and administration building plumbed to building to be used on grey water system (toilets and washing). AMENDED: Consider installation of water tanks on Shire buildings plumbed to building to be used on grey water system (toilets and washing) when renewing assets.

Progress

Late
  • Yet to commence
  • Current
  • Ongoing
  • Completed

Official name

Investigate fire-resistant options for installation of durable water tanks on Shire buildings and administration building plumbed to building to be used on grey water system (toilets and washing).
(According to the action plan)

Annual report

Report: 1/7/2021 30/6/2022
Sustainability Action Plan Annual Report 2021-2022

Current reporting comment

Not budgeted for yet.
Report: 1/7/2022 30/6/2023
Sustainability Action Plan Annual Report 2022-2023_1

Current reporting comment

Not budgeted for yet.
Report: 1/7/2023 30/6/2024
Sustainability Action Plan Report 2023-2024_FINAL

Current reporting comment

Not budgeted for yet. Not listed in CBP 24-28.

Read more

Summary and contacts

Responsible organisations

  • Priority

    Medium

Class

Resourcing Required

  • KPI/Measure of Success

    Increased number of water tanks and pumps installed on Shire buildings and plumbed into the toilets and greywater system
Information updated 10/08/2023