Skip to main content

Organisations

Shire of Denmark /

Waste & Reserves

Responsible in 15 actions

ID
Action title
Implementation phase
StatusResponsible parties
Information updated
ZW1Continue to collaborate with neighbouring Shires through the Regional Waste Alliance
Ongoing
On time
vuosi sitten
ZW2On-going support and co-ordination of the Waste Management Reform Working Group
Completed
On time
vuosi sitten
ZW3Investigate provision of green waste recycling (community purchase of affordable mulch)
Current
On time
vuosi sitten
ZW4Implementation of green waste solutions that do not result in increased emissions through burning
Current
On time
vuosi sitten
ZW5Implement Food Organics and Garden Organics (FOGO) service
Current
On time
vuosi sitten
ZW6Encourage community to dispose of waste products appropriately through standardisation of bin-lid colours implemented on infrastructure
Completed
On time
vuosi sitten
ZW8Support local builders to reduce waste via recycling and reusing commercial and industrial waste as repurposed materials; including investigating licencing requirements to recycle waste from building contractors
Yet to commence
Late
vuosi sitten
SM6Support the reuse and recycling of materials through the Tip Shop
Ongoing
On time
vuosi sitten
SW14Leak reporting process to be established
Completed
On time
vuosi sitten
SW17Audit irrigation system to identify poorly performing irrigation hardware - with replacement and repair parts kept consistent and available to maintain irrigation system performance
Ongoing
On time
vuosi sitten
SW18Meter all bores - install a water meter on all non-scheme water sources to measure flow rate and cumulative volume. Water quality also to be regularly analysed
Current
On time
vuosi sitten
SW19Review existing lease provisions relating to water use for tenanted Shire assets and ensure water use is appropriately considered in new leases.
Yet to commence
Late
vuosi sitten
SW20Landscaping plans to include low water use plants, hydrozoning and soil amendments
Ongoing
On time
vuosi sitten
SW23At least 10% of existing Shire gardens within the CBD which feature only non-native species to be converted to waterwise gardens with only native species
Completed
On time
vuosi sitten
SW24Investigate non-scheme sources of water for irrigating parks and gardens (eg. bore, rainwater tanks)
Current
On time
vuosi sitten